1- THE PROJECT2- STARTING3- TEMPLATES4- AIR INTAKES5- TOP & BOTTOM6- RIBS
7- ASSEMBLING8- CLOSING9- TIP SPARS10- TRAILING EDGE11- CONSIDERATIONS12- TESTS


Last actions where to sew the long trailing edge.
Once again all taped and sewed.
I've left 2 small openings at tips (1 cm) to leave water drain in case of water crash
.
Also added a TE valve for deflating kite (also for preinflation).
This valve is velcro based and is Arc style.


 

 

---> 11- STATS